the three jaw positioning mechanism, the vibration assembly machine and the steel foot positioning fixtures ensure the coaxality of the insulator fittings. the finished insulator is maintained at 60 c -70 c hot pool. after the completion of the maintenance, the 50% tensile load test is carried out according to the technological requirements, and the strength of the insulation structure is automatically checked.